Belize’s Department of the Environment has given the green light to a major submarine fibre-optic cable project that will pass through the country’s territorial waters. The TAM-1 Submarine Cable, proposed by Trans Americas Fiber Systems, will run along the seabed, with part of its route crossing the Sapodilla Cayes Marine Reserve. Although the cable is intended to provide high-speed connectivity between Mexico, Guatemala and Honduras, the project’s Environmental Impact Assessment says the route has been designed so Belize could connect to the network in the future should the Government decide to do so. The system is expected to carry 648 terabytes of data every second, making it significantly more powerful than the existing submarine cable systems that currently serve or pass near Belize. Before construction can begin, the company must sign an Environmental Compliance Plan with the Department of the Environment. Approval follows months of environmental assessment and public consultation, with the National Environmental Appraisal Committee concluding that the project can proceed, provided a series of strict environmental safeguards are observed. The cable will cross two sections of Belizean waters, including a deep-water corridor east of Lighthouse Reef Atoll and a 33-kilometre stretch through Conservation Zone Four of the Sapodilla Cayes Marine Reserve.

2 weeks ago
12
English (US) ·